Risk allocation in U.S. Public-private partnership highway project contracts

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Abstract

Risk is often discussed in connection with public-private partnerships (P3s), and risk allocation is likely a determinant of P3 success or failure. Despite being central to the delineation and allocation of risks, contracts have not been used directly to examine risks in P3s, particularly in the United States. Employing a systematic content analysis framework, the allocation of 31 risks in 21 U.S. highway P3 contracts was determined. These contracts represent the entire population of U.S. highway P3 projects from 2004 through first quarter of 2016 with the exception of one project whose contract was not made available. The results were internally validated through interrater testing and externally validated using bond offering statements. Hence, the investigation is unique in its approach and comprehensive scope. The allocation results demonstrate that some risks were retained by the public sector, but the majority of the 31 risks were either transferred to the private sector or shared. The former outcome is not unexpected because risk transfer is generally viewed as fundamental to the P3 value proposition; however, the prevalence of sharing in the United States market is greater than that conveyed in the literature examining risk allocation in other large markets such as Australia and the United Kingdom. Risk sharing arrangements uncovered ranged from deductible schemes to event mechanisms with the latter employed quite frequently; hence, contract designers rely on ex post remedies to address risks once an event, such as a change in law, occurs. Parametric analysis did not reveal any dominant trends in risk allocation, but examination by the most active jurisdictions (Florida, Texas, and Virginia) and source of risk (exogenous versus endogenous) illustrated that project context influences risk allocation. While some consistency was found in the treatment of the 31 risks, the variation in allocation is further evidence that project-specific factors and environments will continue to challenge efforts to create uniformity in P3 contractual provisions. Additionally, with the U.S. P3 market still evolving, the results provide practitioners implementing P3s or considering their implementation a comprehensive overview of risk allocation practices and contractual language across a variety of project characteristics. Consequently, the results can inform practitioner decisions regarding risk allocation and contract design.

Item Type: Article
Uncontrolled Keywords: content analysis; contract; highways; public-private partnerships; risk allocation; risks
Index terms: testing, determinant, sharing arrangement, implementation, markets, highway construction, parametric analysis, risk allocation, investigation, partnership, private sector, designer, Australia, public sector, variation, population, practitioner, evidence, United Kingdom, content analysis, jurisdiction, United States
Subjects: practitioner, profession, risk assessment, evaluation and assessment methods, data collection methods, data analysis and analytics, contractual arrangements, legal systems, professional practice, economic analysis, Geography, contractual condition, financial risk, civil engineering, industry analysis, administrative law, demography, partnership management
Topics: Urban Studies, Legal Issues, Contract Administration, Business Strategy, Cost Management, Engineering Principles, Research Practice, Geographical Context, Risk Management, Stakeholder Management, Roles and Professions, Procurement
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here