New approach to the distribution of project completion time in PERT networks

Salas-Morera, L; Arauzo-Azofra, A; García-Hernández, L; Palomo-Romero, J M and Ayuso-Muñoz, J L (2018) New approach to the distribution of project completion time in PERT networks. Journal of Construction Engineering and Management, 144(10): 04018094, ISSN 0733-9364

Abstract

Normal distribution has been commonly accepted as the probability function for whole project duration estimation. Nevertheless, this assumption does not hold in complex projects with many activities and paths, particularly when there are several paths with similar mean duration to that of the critical path (dominating paths). In such cases, Extreme Value distribution has been suggested in the literature as a good fit, but the tests carried out in this paper show that its practical utility is limited. In this context, this paper develops a strategy to find another candidate distribution function. The methodology to do this consisted of three phases: (1) an extensive set of tests to corroborate whether Normal and Extreme Value distributions actually fit simulated data; negative results were obtained; (2) a new set of tests were performed to determine the mean and standard deviation of simulated data from the project parameters, and the Gamma distribution was proposed as a new candidate; and (3) a new set of tests was performed in order to validate the proposed model. All data have been taken from the Project Scheduling Problem Library (PSPLIB). The results show a good fit of the Gamma distribution in most of the cases, especially when Beta distribution is the underlying distribution of activity durations. The main contribution of this new approach is to give project managers the potential to obtain a more accurate project duration estimation using the same parameters as other traditional methods with no computational cost increase. The proposed model avoids time underestimations and overestimations, which could result in additional project execution costs.

Item Type: Article
Index terms: completion time, distribution function, methodology, cost increase, project scheduling, critical path, strategy, complex project, duration, project manager, estimation, deviation
Subjects: operations research, financial and cost management, strategic project management, profession, project controls, management, research methods, economics, probability and distributions
Topics: Time Control, Project Management, Research Practice, Cost Management, Business Strategy, Roles and Professions
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here