Compensation cost estimation model for construction noise claims using case-based reasoning

Kwon, N; Cho, J; Lee, H S; Yoon, I and Park, M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management, 145(8): 04019047, ISSN 0733-9364

Abstract

Noise due to construction is recognized as a crucial source of harm to the surroundings of a site. A number of noise-related problems can cause significant risk to an ongoing project. As a first step toward coping with noise, this paper presents a model developed for estimating the noise-related compensation cost through case-based reasoning (CBR). An experiment was performed with 20 randomly selected test cases. The compensation costs were estimated based on damage days and excessive noise level of similar cases. A Monte Carlo simulation (MCS) was adopted to deal with limited and uncertain data. The results showed that the cases had a similarity of 91.8% on average, and the mean absolute error ratio (MAER) of the estimated cost based on data revised by MCS was approximately 11.8%. This indicates that the estimated and actual costs were similar, which validates the applicability of the model. This research contributes to the field of construction noise management by providing environmental managers with a systematic approach for estimating noise-related compensation during the preconstruction phase.

Item Type: Article
Uncontrolled Keywords: case-based reasoning; compensation estimation; noise management; noise-related problems; preconstruction phase
Index terms: experiment, manager, actual cost, case-based reasoning, cost estimating, estimating, construction noise, Monte Carlo simulation, estimation, compensation, coping, test case
Subjects: behavioral psychology, cognitive psychology, professional practice, financial and cost management, modelling and simulation, environmental impact, dispute resolution, practitioner, data collection methods
Topics: Cost Management, Engineering Principles, Research Practice, Roles and Professions, Sustainability, Legal Issues
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here