Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364
Abstract
Historical bid items from previous projects are an important source of data for project cost estimation. State highway agencies have widely used this data source for budget planning of highway projects. Current practices on using the data are, however, not efficient and fail to provide a reliable estimate. The estimate is simply based on the mean value, which is then manually adjusted by professionals using their knowledge and experience. A highway project is unique, and its price is highly dependent on various factors including location and the type of construction activities. A geospatial analytic method for project cost estimates would be highly useful for automated assessment of these influencing factors. The state of the art has applied interpolation methods to location cost-adjustment factors to adjust the total costs of two similar projects in two different cities. However, existing methods are mostly beneficial to conceptual cost estimation without considering variances between two projects in the same city and various effects of location on different work activities. This study contributes to the body of knowledge by proposing a geographic information system-based framework that leverages historical bid data for unit-price estimation and visualization with consideration of the effects of project-specific location on different bid items. Apart from applying established spatial interpolation methods to unit-price estimation, various strategies such as the use of quantity in interpolation models are proposed to improve the accuracy of the estimates. Temporal changes in unit prices and relationships between quantities and unit prices are also explored.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | data visualization; geographic information systems; highway projects; spatial interpolation; unit-price estimation |
| Index terms: | cost estimating, strategy, data visualization, accuracy, project cost, state of the art, agency, visualization, body of knowledge, estimating, influencing factor, variance, construction activity, estimation, highway construction, geographic information system, estimate |
| Subjects: | data science, knowledge management, construction operations, financial and cost management, research dissemination and communication, risk assessment, geographical techniques and analysis, measurement and scaling, sociology, design practice, management, civil engineering, economics, professional development |
| Topics: | Risk Management, Cost Management, Business Strategy, Research Practice, Geographical Context, Engineering Principles, Information Management, Site Management, Design Practice, Digital Applications |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here