Classification of modular building construction projects based on schedule-driven approach

Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364

Abstract

Modular construction projects involve concurrent manufacturing production and construction processes for constructing the main structure and the foundation, on-site installation, and finishing work. Using process-driven project scheduling, it is difficult to analyze how different issues affect the overall project schedule and determine alternative solutions based on what-if scenario analysis (WISA). This paper proposes the classification of modular building construction projects as manufacturing driven, on-site driven, or a combination to improve scheduling strategies based on a schedule-driven approach. The scheduling focus is shifted from the working precedence (manufacturing → transportation → installation) to project scales and constraint changes. A discrete-event simulation model is developed for modular construction projects, and WISA is performed in actual modular construction projects. It is noted that compared with the existing WISA method that obtains construction schedule probabilities for specific tasks sequentially and independently, scheduling-based project classification and reflection of expected events are more effective in examining and determining scheduling alternatives. The proposed scheduling strategies and simulation model can enable project managers to assess several alternative scheduling solutions based on project characteristics.

Item Type: Article
Uncontrolled Keywords: concurrent scheduling; discrete-event simulation; modular building construction; project classification; scheduling; what-if scenario analysis
Index terms: strategy, project scheduling, construction process, modular building, scenario analysis, modular construction, scheduling, reflection, construction project, project manager
Subjects: project controls, management, professional development, production management, policy studies, building construction, profession, operations research
Topics: Time Control, Information Management, Project Management, Governance, Roles and Professions, Construction Technology, Business Strategy, Site Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here