Nasirian, A; Arashpour, M; Abbasi, B and Akbarnezhad, A (2019) Optimal work assignment to multiskilled resources in prefabricated construction. Journal of Construction Engineering and Management, 145(4): 1627, ISSN 0733-9364
Abstract
Multiskilling allows for dynamic reallocation of workers from one stage of production to another in response to bottleneck configurations and, therefore, has been advocated as a potential strategy to improve productivity in off-site construction. The aim of this research is to investigate the extent to which operational benefits associated with different resource management policies pertaining to bottleneck configurations can be achieved in off-site construction. To this end, the flow shop environment is recognized as an appropriate operational framework for modeling production dynamics. A quadratic resource allocation model was developed to expose different operational performances corresponding to different resource management strategies. Different resource management policies included no cross-training, hiring single-skilled crew, direct capacity balancing, chaining, and hiring multiskilled crew. Operational performance encompassed makespan and labor costs. Production data from a prefabrication factory based in Melbourne, Australia, were fed to the model, providing the basis for comparison of different resource management policies. Research findings contribute to resource planning and management in off-site construction.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction; labor; manufacturing; multiskilling; optimization; prefabrication; skill set |
| Index terms: | labour cost, dynamics, prefabrication, off-site construction, modelling, resource planning, resource management, resource allocation, productivity, Australia, configuration, strategy |
| Subjects: | building construction, systems engineering, cost management, management, Geography, resource management, analytical methods, control systems |
| Topics: | Site Management, Procurement, Construction Technology, Business Strategy, Project Management, Geographical Context, Engineering Principles |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here