BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints

Abbasi, S; Taghizade, K and Noorzai, E (2020) BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints. Journal of Construction Engineering and Management, 146(12): 04020143, ISSN 0733-9364

Abstract

Because of the complexity of construction projects, the use of building information modeling (BIM) has become a more efficient solution. The main problems with conventional methods, such as the critical path method and program evaluation and review technique, are the lack of precision in predicting time due to the dynamics of the construction process. One solution is to combine planning models with discrete event simulation (DES) and BIM to simulate the dynamic environment to reduce uncertainties. Likewise, DES is used to implement just in time (JIT). A problem with JIT implementation using DES in the construction industry is a lack of accurate measurement of the optimum time for each process. Meanwhile, takt time, one of the main techniques in JIT, was used in this research to achieve the optimal time of each process and was combined with DES to solve this problem. First, a 4D BIM model was developed to extract data. Then, takt time was used to achieve optimal time for each activity, and eventually, a DES was performed. The results of this study indicate that the proposed framework using takt time and its combination with DES to integrate BIM with JIT will lead to realistic and optimal planning.

Item Type: Article
Uncontrolled Keywords: building information modeling; discrete event simulation; just in time; takt time
Index terms: complexity, critical path method, construction process, construction project, just-in-time, programme evaluation and review technique, building information modelling, discrete event simulation, construction scheduling, implementation, construction industry, dynamics
Subjects: building construction, lean logistics, project controls, information systems, systems engineering, industry analysis, production management, operations research, modelling and simulation, contractual arrangements
Topics: Procurement, Engineering Principles, Project Management, Research Practice, Site Management, Time Control, Supply Chain Management, Digital Applications
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here