Automatic indoor construction process monitoring for tiles based on BIM and computer vision

Deng, H; Hong, H; Luo, D; Deng, Y and Su, C (2020) Automatic indoor construction process monitoring for tiles based on BIM and computer vision. Journal of Construction Engineering and Management, 146(1): 04019095, ISSN 0733-9364

Abstract

For project managers, accurate, timely, and intuitive information is the key to successful decision-making during progress control at a construction site. This paper presents a method that combines computer vision with building information modeling (BIM) for automated progress monitoring of tiles. This method can automatically and accurately measure the in-built progress information of a construction site and transmit real-time progress information to the cloud in a visualized form. With the in-built and real-time progress information, project managers can know the progress of construction site in time and make decisions easily. The proposed method includes several modules. First, an image database is built with thousands of tile images, and a variety of local binary patterns (LBPs) feature extraction methods, and support vector machines (SVMs) are used to train a tile classifier with satisfactory performance, with an accuracy of 91.17%. The purpose of the first module is to construct a mathematical feature of an image and to train a classification algorithm according to this feature, so that tiles in images can be identified. The improved edge detection algorithm detects the boundaries of completed tiles in given images. Afterward, the boundary line coordinates are converted from image pixel coordinates to a real-world coordinate system through camera calibration. Next, using the information from the camera location and room profile information extracted from the BIM model, the actual tile area can be calculated automatically. Finally, the in-built progress is highlighted in the room floor plan, and the result is delivered to the BIM cloud simultaneously. The proposed method was tested at a real indoor construction site. The experimental results indicate that the method can effectively carry out real-time automatic quantity calculations.

Item Type: Article
Uncontrolled Keywords: automatic progress monitoring; building information modeling; computer vision; project management
Index terms: boundaries, progress monitoring, decision-making, construction process, accuracy, construction site, computer vision, project management, module, monitoring, database, project manager, building information modelling
Subjects: control systems, profession, property law, work location, computer vision, professional development, project management theory and practice, architectural elements, information systems, project controls, data management, building construction, decision analysis
Topics: Time Control, Site Management, Digital Applications, Design Practice, Legal Issues, Risk Management, Roles and Professions, Information Management, Project Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here