Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control

Mahdavian, A and Shojaei, A (2020) Hybrid genetic algorithm and constraint-based simulation framework for building construction project planning and control. Journal of Construction Engineering and Management, 146(12): 04020140, ISSN 0733-9364

Abstract

In the construction sector, the absence of a framework to incorporate and synchronize the resources required for activities means that projects risk incurring cost and time overruns. In this study, a framework was generated and tested to optimize resource allocation. The framework considers financial constraints through a genetic algorithm process and constraint-based simulation. The simulation method was developed based on the critical path method relation-defining system, with a dynamic prioritizing system automatically creating the simulation network. By introducing a standard cost database to the data management section of the framework, the total work required to insert data manually is minimized. For the majority of the activities, the user simply chooses an activity and determines its relationships with other activities. The rest of the initial required data are automatically pulled from the imported databases. The validity of the developed framework was demonstrated through a case study on constructing the structure of a residential building in Tehran, including four structural systems. The four systems were compared regarding time and cost of execution to illustrate the relevance of the framework. The framework decreases the user's manual work while producing outputs of time, cost, and resources that are compatible with building information modeling (BIM) software. Overall, the result is an enhanced quality of project management plans. Moreover, the framework can be used as a planning tool at the preconstruction stage or as a control tool during the construction phase. The proposed approach provides a realistic project management plan, with the potential for substantial savings in finances and resources.

Item Type: Article
Index terms: building construction, genetic algorithm, project planning, critical path method, construction sector, Tehran, validity, database, savings, data management, time overrun, case study, prioritizing, building information modelling, residential building, resource allocation, project management, construction phase
Subjects: operations research, economic analysis, resource management, project delivery, construction type, data collection methods, evaluation and assessment methods, control systems, decision analysis, building construction, data management, project controls, information systems, industry analysis, algorithms, project management theory and practice, Geography
Topics: Digital Applications, Time Control, Site Management, Research Practice, Geographical Context, Project Management, Business Strategy, Construction Technology, Risk Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here