Nguyen, P H D; Tran, D and Lines, B C (2020) Fuzzy set theory approach to classify highway project characteristics for delivery selection. Journal of Construction Engineering and Management, 146(5): 04020044, ISSN 0733-9364
Abstract
Selecting an appropriate delivery method for highway projects is a complex decision process. Delivery decisions typically involve evaluating both quantitative (e.g., cost, schedule) and qualitative (e.g., project complexity, delivery risk) criteria. Although many studies have proposed processes and guidance to select the most suitable delivery method, there is a lack of understanding on how to rigorously address qualitative criteria. This study aimed at applying fuzzy cluster analysis to investigate cost performance associated with qualitative criteria, including project complexity and delivery risk. The proposed approach includes three main steps: (1) assess data clustering tendency; (2) determine number of clusters; and (3) validate clustering result. An empirical data set of 254 completed highway projects was used to develop and illustrate the proposed approach. The result shows seven clusters for comparing cost performance between design-bid-build (D-B-B) and design-build (D-B) projects. D-B-B produces low-cost growth for Project Cluster 1, but medium- to high-cost growth for Project Cluster 3. D-B produces low-cost growth for Project Clusters 2, 4, 5, and 7. For Cluster 6, there is no difference in cost growth between D-B-B and D-B. The findings also indicate that D-B outperformed D-B-B in new, complex, and highly risky projects, whereas D-B-B was a better choice in certain reconstruction projects. This study contributes to the body of knowledge by identifying seven groups of highway projects that have many commonalities with respect to project attributes and cost performance associated with the use of D-B-B and D-B. The identified groups may help highway agencies better understand and select the most suitable delivery method for their projects.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | cluster analysis; complexity; cost performance; fuzzy set theory; project delivery methods; risks |
| Index terms: | reconstruction, fuzzy set theory, design-bid-build, decision process, delivery method, highway construction, project delivery, clustering, cluster analysis, project complexity, cost performance, complexity, agency, body of knowledge |
| Subjects: | contractual arrangements, data analysis and analytics, knowledge management, data science, project delivery, decision-making and optimization, systems engineering, delivery method, decision analysis, sociology, building construction, organizational theory, economics, civil engineering |
| Topics: | Digital Applications, Cost Management, Research Practice, Project Management, Information Management, Engineering Principles, Risk Management, Procurement |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here