Project managers' performance measures: A fresh perspective

Ahadzie, D K; Proverbs, D G and Olomolaiye, P (2005) Project managers' performance measures: A fresh perspective. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Abstract

While performance measures are widely held as a viable option for providing appropriate evaluative criteria against which effective managerial performance can be validated, research towards project managers' (PMs') performance measures has not been vigorously pursued in construction. This paper is a contribution towards addressing the apparent weakness. Consequently, drawing on the theory of job performance improvement and the criteria of effective project management and project success, it is contended that an appropriate methodology for developing a robust evaluative criteria is for the measures to be based on both performance outcomes and the elements of task and contextual performance behaviours. It is also contended that, there is a need to link the measures to various project phases to help provide support for continuous performance improvement. Consequently, it is intended to use the proposed methodology on an ongoing study aimed at developing a predictive model for evaluating the performance of PMs in Mass House Building Projects (MHBPs) in Ghana.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: contextual performance behaviours; performance measures; performance outcomes; project managers and task performance behaviours
Index terms: methodology, performance improvement, project management, option, project success, project manager, performance outcome, Ghana, drawing, performance measure
Subjects: performance measurement, research methods, Geography, project management theory and practice, decision analysis, profession, value management, technical documentation
Topics: Project Management, Geographical Context, Research Practice, Roles and Professions, Risk Management, Design Practice, Quality Management
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here