Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis

Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364

Abstract

The duration of a construction project is a key factor to consider before starting a new project. It needs to be accurately estimated from an early stage. Many researchers demonstrated the applicability of regression analysis (RA) in preliminary duration estimation for construction projects; however, RA and similar models fail to simulate the complex behavior of problems in estimating. In contrast, artificial neural networks (ANNs) have several significant benefits that make them powerful and practical for solving complex problems in the field of construction engineering and modeling nonlinearity in the data. Nevertheless, ANNs have constraints because of the absence of structured methodology to decide on various control features and their "black box"nature, which does not explain the underlying input-output process. Moreover, unlike construction cost, construction duration is not determined by the summation of all activities, but only by critical activities. Given these factors, this work presents a feature selection method while applying ANNs for estimating construction duration in the preliminary stage, and proposes a two-stage ANN to take into account the specific nature of construction duration. The results confirm the potential of two-stage ANNs and feature selection by sensitivity analysis to provide a more accurate estimate of construction duration and unlock potential knowledge in the network system to increase user confidence in ANN use.

Item Type: Article
Uncontrolled Keywords: artificial neural network; duration; feature selection; prediction; sensitivity analysis
Index terms: methodology, construction project, estimating, sensitivity analysis, artificial neural network, selection method, construction engineering, regression analysis, estimate, modelling, duration, estimation, construction cost
Subjects: production management, research methods, engineering methods, tendering, environmental hazards, statistical analysis, project controls, analytical methods, financial and cost management, modelling and simulation
Topics: Time Control, Procurement, Sustainability, Cost Management, Research Practice, Project Management, Engineering Principles
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here