Stochastic programming model for bidding price decision in construction projects

Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364

Abstract

In competitive bidding, the success and/or failure of the contractors strongly depends on their submitted bid price. Hence, the bidding price decision is a strategic subject for contractors of construction projects. This paper develops a stochastic programming model for determining the optimum bidding price in construction projects. Some model parameters, such as the number of competitors and the project's cost, are estimated by analyzing historical data. Then, a mathematical model for the bidding price decision that maximizes the expected profit is proposed. To reduce the risk of suffering from a large loss, a maximum acceptable risk constraint is employed. To evaluate the model's performance, some numerical problems are examined. Moreover, sensitivity analysis of the key parameters and a robustness evaluation of the model against uncertain parameters are conducted. To evaluate the model's effectiveness in real-world situations, a case study is analyzed using the proposed approach. The numerical results indicate that the proposed approach reduces the cost estimation errors and increases the average expected profit, which validates the applicability of the model. This research contributes to the community of contractors of construction projects by providing a new approach for determining the optimum bidding price that is in greater accordance with real-world constraints.

Item Type: Article
Uncontrolled Keywords: average expected profit; bidding price; construction projects; risk of loss
Index terms: effectiveness, case study, bidding, programming, construction project, profit, sensitivity analysis, cost estimating, competitive bidding, mathematical model
Subjects: production management, performance management, environmental hazards, programming, mathematical modelling, data collection methods, financial and cost management, economic analysis, bidding
Topics: Sustainability, Procurement, Project Management, Research Practice, Business Strategy, Cost Management, Quality Management, Digital Applications
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here