Yoon, S; Weidner, T and Hastak, M (2021) Erratum: Total-package-prioritization mitigation strategy for deferred maintenance of a campus-sized institution (journal of construction engineering and management DOI: 10.1061/(ASCE)CO.1943-7862.0001956). Journal of Construction Engineering and Management, 147(7): 08221001, ISSN 0733-9364
Abstract
In the original version of this article, the first author’s affiliation is incorrect. The correct affiliation is provided herein.
| Item Type: | Article |
|---|---|
| Index terms: | construction engineering, strategy, package, journal, mitigation |
| Subjects: | research dissemination and communication, engineering methods, financial risk, contractual arrangements, management |
| Topics: | Business Strategy, Cost Management, Engineering Principles, Procurement, Research Practice |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here