Legal risk assessment framework for international PPP projects based on metanetwork

Zhang, J; Wang, T and Zhang, L (2021) Legal risk assessment framework for international PPP projects based on metanetwork. Journal of Construction Engineering and Management, 147(8): 04021090, ISSN 0733-9364

Abstract

The number of international public-private partnership (PPP) projects has gradually increased with global infrastructure interconnections. These international projects incorporate high risks, and legal risk is one of the most serious risks. International PPP projects have long life cycles, and the specific legal risks in each stage may be different and related to each other. However, previous risk assessment methods have ignored the correlation and variation of legal risk factors in different stages, which have limited applications in risk management practice. Therefore, this paper establishes a legal risk analysis framework for international PPP projects based on metanetwork analysis (MNA) to evaluate the legal risks of the entire project life cycle in stages and calculate the correlations between different risk factors. Then the framework was applied to a Peruvian international PPP project. The key legal risk factors in each stage were identified, the main risk-spreading paths were depicted, and the influence and independence of risk factors were calculated. This framework is expected to provide guidance for foreign private contractors of international PPP projects to conduct fine management of legal risks.

Item Type: Article
Uncontrolled Keywords: international projects; legal risk assessment; metanetwork; public-private partnership
Index terms: international project, risk management, risk assessment, partnership, risk analysis, risk factor, life cycle, variation
Subjects: risk assessment, partnership management, strategic management, contractual condition, environmental hazards, value management, financial risk
Topics: Project Management, Cost Management, Stakeholder Management, Contract Administration, International Construction, Sustainability, Risk Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here