Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid

Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364

Abstract

A decision analysis model is presented that can be used by a contractor to determine the optimum lump-sum bid that maximizes expected utility for an upcoming job. Required inputs include the contractor's utility curve, the distribution of the opponents' low bid-to-cost ratio, and the distribution of the project cost. Closed-form expressions for expected utility are developed for an exponential utility curve and normally distributed project cost that can also be used as approximations for other models. Any appropriate bidding model can be used to estimate the probability to win. Important concepts introduced include the certain equivalent and the risk premium for a project profit lottery, corporate indifferent buying price (CIBP), and risk-adjusted cost (RAC). Parametric curves from the maximization of expected utility over a total of 21,462 combinations of the contractor's risk tolerance and the standard deviation of project cost illustrate the considerable impact of risk aversion and cost uncertainty on the optimal bid-to-cost ratio, on the probability of losing money on the job, and on the certain equivalent and risk premium for profit. This sensitivity analysis shows that maximizing expected utility can result in an optimal bid-to-cost ratio that can be significantly different (smaller or larger) than the bid-to-cost ratio found by only maximizing expected profit and ignoring the significant impact of uncertainty in project cost σ. The presented procedure allows contractors to use any appropriate model for the probability of winning (such as those proposed by Friedman, Gates, Carr, or Ioannou), assess their risk tolerance and the standard deviation of project cost, and select an optimal bid price that maximizes their expected utility for profit.

Item Type: Article
Uncontrolled Keywords: bidding models; carr; certain equivalent; competitive bidding; contracting; corporate indifferent buying price; expected profit; expected utility; exponential utility curve; friedman; gates; management; markup; optimal bid; probability models; probability to win; risk aversion; risk premium; risk-adjusted cost
Index terms: bidding, estimate, project cost, profit, competitive bidding, risk premium, deviation, decision analysis, sensitivity analysis, maximization
Subjects: bidding, algorithms, environmental hazards, decision analysis, economic analysis, economics, financial and cost management
Topics: Procurement, Sustainability, Cost Management, Digital Applications, Risk Management, Business Strategy
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here