Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Abstract
Cost estimation is critical to a typical transportation project's development process. Specifically, project owners use cost estimates during the scoping phase to set project budgets for funding approval and cost management. Because of the lack of detailed design, state transportation agency (STA) estimators often rely on the Pareto principle, also known as the 80/20 rule, in early cost estimating by estimating only high-impact work items and roughly calculating the costs of remaining items using a fixed percentage. However, it is a heuristic rule of thumb that does not apply to every scenario. Moreover, STAs' guidance is minimal, and few studies have investigated the validity of this common practice. This study proposes two novel models that utilize well-established multiobjective optimization methods to automatically determine optimal major work items and necessary related information to apply the items to STAs' scoping-phase estimating of new projects. A case study was conducted using an STA's actual historical bid tabulation data for two project work types. The first model's output shows that 10% and 20% of the work items can respectively contribute up to 92% and 97% of total project cost, and the cost contribution ratios vary with not only project work types but also projects under the same type, with coefficients of variance minimized simultaneously and calculated by the model. Because of the variance, mean or median measures can represent the center of cost percentages for estimating new projects' total cost from major items' costs. The second model's results reveal that using the median is preferred because of lower expected errors. Also, using an optimal 10% item set and the median of its cost contribution ratios in past projects to estimate future projects results in the approach's expected average error of 8.5%, which is acceptable in the scoping phase.
| Item Type: | Article |
|---|---|
| Index terms: | variance, heuristic, case study, transportation agency, owner, validity, cost management, funding, estimate, cost estimate, approval, cost estimating, transportation project, project cost, estimator, estimating |
| Subjects: | risk assessment, profession, contractual role, evaluation and assessment methods, data collection methods, economic analysis, financial and cost management, accounting and finance, economics, measurement and scaling, sociology, transportation engineering, infrastructure and transport systems |
| Topics: | Business Strategy, Cost Management, Research Practice, Engineering Principles, Risk Management, Stakeholder Management, Roles and Professions, Contract Administration |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here