Lv, L; Wang, Z; Li, H; Zhang, C and Qiao, R (2022) Tournament incentive mechanisms design for long-distance water diversion projects incorporating preference heterogeneity. Journal of Construction Engineering and Management, 148(6): 04022036, ISSN 0733-9364
Abstract
The owner often entrusts multiple contractors to construct in parallel due to the linear distribution of a long-distance water diversion project (LDWDP). However, multiple contractors with more information are more likely to engage in opportunistic behaviors harming the project and the public interest. The tournament incentive mechanism is considered to be one of the most effective measures to solve this issue. There are few studies on tournament incentive in construction project management, and the heterogeneous characteristics of psychological preference and the differences in tournament form are ignored. Therefore, to bridge these gaps, the tournament theory is introduced in this study to design multicontractor incentive mechanisms considering fairness preferences and self-interest preferences in a LDWDP contract. The primary contributions of this study are (1) to develop multicontractor tournament incentive models considering the preference heterogeneity based on the Lazear-Sherwin (LR) tournament incentive model and the Fehr-Schmidt fairness preference model, thus remedying the lack of a multicontractor incentive mechanism in the construction project field; (2) to explore the impact of tournament grouping arrangement on the incentive structure and incentive effect under three scenarios to help the owners improve practical guidance for formulating an incentive mechanism; and (3) to design the incentive intensity associated with each contractor's relative ranking and absolute output performance to provide a theoretical basis for the transaction governance of large projects involving multiple contractors. This study not only improves the optimal incentive contract for LDWDP theoretically but also enriches and promotes the development of behavioral contract theory in various fields.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | fairness preferences; long-distance water diversion projects; self-interest preferences; tournament grouping; tournament incentive |
| Index terms: | construction project, preference, incentive contract, opportunistic behaviour, construction project management, fairness, public interest, governance, owner, contract theory |
| Subjects: | leadership, political science, sociology, production management, project management theory and practice, decision-making and reasoning, contractual arrangements, legal systems, business |
| Topics: | Stakeholder Management, Procurement, Governance, Research Practice, Project Management, Organizational Design, Legal Issues |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here