Multiskilled workforce planning: A case from the construction industry

Nasirian, A; Abbasi, B; Cheng, T C E and Arashpour, M (2022) Multiskilled workforce planning: A case from the construction industry. Journal of Construction Engineering and Management, 148(5): 04022021, ISSN 0733-9364

Abstract

The objective of this research was to present a platform to identify the optimal staffing of a multiskilled workforce in the construction industry. The novelty of our model is its capability in developing a customized and context specific multiskilled workforce staffing strategy that identifies the best compromise between multiskilling costs and benefits with consideration of unique features of different production environments. Another novelty of our multiskilled workforce staffing is its capacity to explore every possible schedule associate with every possible staffing strategy. Our model chooses the multiskilling staffing strategy corresponding to the schedule that leads to the best results in terms of cost and time. The paper examined optimal multiskilling staffing and scheduling and compared it with well-regarded existing multiskilling strategies in the construction industry, such as chaining and direct capacity balancing, using an optimization technique. The parameters of the optimization model were informed by a small hypothetical case and a real case off-site construction factory producing bathroom pods in Australia. Developed an optimal multiskilling staffing strategy continuously and in some cases significantly outweighed the existing well-regarded multiskilling strategies. The optimal multiskilling staffing strategy is highly context-specific and can be very complex because achieving it needs having an appropriate staffing platform. Subjective decision making on a multi skilling staffing strategy that does not deploy the workforce to the most appropriate workstations can lead to a significant productivity loss.

Item Type: Article
Uncontrolled Keywords: multiskilling of workforce; off-site construction; operation cost; operation time; scheduling; staffing
Index terms: decision-making, strategy, multi-skilling, scheduling, off-site construction, construction industry, workforce planning, productivity, Australia, optimization technique, platform
Subjects: operations research, flexibility, industry analysis, decision analysis, building construction, Geography, digital design, management, algorithms
Topics: Digital Applications, Human Resources, Time Control, Business Strategy, Research Practice, Geographical Context, Risk Management, Construction Technology
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here