Integrated offsite logistics scheduling approach for high-rise modular building projects

Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364

Abstract

By maximizing offsite work and minimizing onsite activities, modular construction has become increasingly popular in high-rise, high-density cities. For successfully delivering high-rise modular buildings, a key issue is the effective scheduling of offsite logistics, consisting of module manufacturing, transportation, and storage. This paper proposes an integrated offsite logistics scheduling approach for high-rise modular building projects that addresses project-specific constraints and uncertainties, based on the stochastic Petri net (SPN) method. The proposed approach supports multi-criteria decision-making, that considers completion time, total cost, storage capacity utilization, and production process stability under what-if scenarios. Its efficacy and novelty for offsite logistics scheduling were demonstrated through a real-life project case study. The results indicate the need to (1) strengthen suppliers' demand responsiveness by shortening module production time; (2) enhance manufacturing flexibility by increasing factory storage utilization; (3) improve supply chain synchronization; and (4) capitalize on the government's role in offsite logistics enhancement. The findings methodologically innovate offsite logistics scheduling, and practically support contractors and module suppliers in successfully delivering high-rise modular building projects in high-density cities.

Item Type: Article
Uncontrolled Keywords: modular construction; modular integrated construction; offsite logistics; petri net; scheduling; supply chain
Index terms: stability, density, completion time, onsite, modular building, module, modular construction, production process, scheduling, case study, multi-criteria decision-making
Subjects: data collection methods, decision analysis, structural engineering, architectural elements, project controls, building construction, manufacturing engineering, operations research, analytical methods
Topics: Construction Technology, Research Practice, Risk Management, Time Control, Engineering Principles, Urban Studies, Design Practice
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here