Aghajamali, K; Nekouvaght Tak, A; Taghaddos, H; Mousaei, A; Behzadipour, S and Hermann, U (2023) Planning of mobile crane walking operations in congested industrial construction sites. Journal of Construction Engineering and Management, 149(7): 04023047, ISSN 0733-9364
Abstract
The trend toward more compact designs and congested site layouts makes it challenging for lift planners to provide feasible lift paths for mobile cranes, confronting the added risk of potential collisions when maneuvering through on-site obstacles. In some cases, particularly in congested industrial modular projects, it is inevitable for mobile cranes to walk with loads to a position with sufficient clearance to perform the lifts and place the objects in their final set position. This study contributes to the body of knowledge by introducing a comprehensive lift planning framework to plan complicated lifts involving mobile crane walking operations. Due to the lack of reliable and accurate plans for such lifts in practice and the added complexities, they are often eluded by practitioners compared with the more straightforward pick-and-set scenarios. This study proposes an algorithm for optimized planning of crane walking-involved lift operations borrowing an obstacle avoidance technique from robotics. The proposed path planner thoroughly considers site constraints and crane configurations to prevent collision between the crane body and the load with preinstalled objects. Actual case studies are presented to validate the efficiency of the proposed algorithm. The system generated the presented real-world lift in less than 5 min, satisfying the operations' optimality, safety, and feasibility.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | automation; crawler cranes; lift planning; mobile crane; modular construction; path planning; robotics in construction |
| Index terms: | automation, industrial construction, robotics, planner, case study, efficiency, complexity, body of knowledge, configuration, practitioner, modular construction, compact design, site layout |
| Subjects: | site logistics, knowledge management, data collection methods, profession, practitioner, building construction, specialized design, systems engineering, performance management, automation and robotics |
| Topics: | Research Practice, Information Management, Engineering Principles, Construction Technology, Roles and Professions, Quality Management, Design Practice, Digital Applications, Site Management |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here