Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Abstract
It is critical for project owners to have a reasonable estimation of project duration before the letting date for contract time determination and project management purposes. To determine the project duration, highway agencies employ scheduling techniques and arrange activities in sequential order. Activity sequencing is a crucial task since a slight change in the sequence of critical activities can significantly influence project duration. Also, the task of activity arrangement is time-consuming for a broad portfolio of projects and requires skillful schedulers. To aid activity sequence determination, prior studies used project drawings, expert knowledge, and historical data to identify sequence rules, logic templates, and sequence prediction models. However, weaknesses and areas of improvement exist, including a lack of adequately leveraging available historical data, the necessity of human input, reliance on human experience rather than data, and poor detection of the overlapping time of activities. This study proposes a novel framework that predicts the sequences of work activities using historical daily work reports to train a long short-term memory recurrent neural network to predict the activity sequence and overlapping in future projects. The daily work reports of 720 highway projects obtained from a highway agency are used as the case study. A novel evaluation technique based on conditional probability is used to assess the model and compare its output sequence to sequences created randomly. The assessment results indicate that the model's output is superior in 94.4% of situations, suggesting a high level of model reliability. The impact of key project characteristics such as project work type and size on activity prediction is examined, indicating a significant impact of project work type and no impact of project size on activity prediction. The results of this study can assist highway project owners in activity sequence and overlap determination by entering a series of activities and receiving the likely next successors.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | activity sequencing; daily work report; highway projects; long short-term memory; machine learning; project scheduling |
| Index terms: | scheduler, project scheduling, activity sequence, machine learning, case study, evaluation technique, neural network, drawing, prediction model, agency, scheduling, owner, successor, duration, estimation, project management, highway construction |
| Subjects: | technical documentation, practitioner, sociology, operations research, artificial intelligence, project management theory and practice, financial and cost management, civil engineering, evaluation and assessment methods, prediction and forecasting, project controls, data collection methods |
| Topics: | Engineering Principles, Design Practice, Digital Applications, Research Practice, Stakeholder Management, Project Management, Roles and Professions, Time Control, Cost Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here