Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Abstract
A method for construction process planning is presented together with a visualization and computing support tool named ViWoLZo-2. The method is based on the work density construct that depicts the time a trade contractor (trade) needs to complete a certain scope of work, location by location. The method helps planners explore alternative process durations by allowing them to divide the work space into zones to increase concurrency in their plan and smooth the workflow. ViWoLZo-2 can be configured for any site plan and process step sequence. The program computes work density, which is then used for workload leveling and zoning, and depicts metrics to gauge the quality of the plan. Although work density data may not yet be readily available, they can be collected and used in ViWoLZo-2 to support a planner's what-if analyses and replace more subjective approaches for creating plan concurrency. The paper concludes with recommendations for tool enhancements and suggestions for follow-on research. The contribution to knowledge is the design and implementation of a novel tool for construction process planning.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | lean construction; location-based scheduling; process planning; takt planning; work density; work density method; workload leveling |
| Index terms: | visualization, workflow, trade contractor, construction process, program, computing, zoning, workload, lean construction, scheduling, implementation, duration, planner, density |
| Subjects: | practitioner, computing systems, profession, analytical methods, contractual arrangements, operations research, urban planning, software systems, design practice, management, building construction, project controls |
| Topics: | Human Resources, Design Practice, Digital Applications, Urban Studies, Time Control, Site Management, Business Strategy, Procurement, Governance, Roles and Professions |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here