Capturing client needs in refurbishment projects

Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Abstract

The briefing process in construction projects involves the documentation and communication of clients' requirements and represents a cornerstone for achieving client satisfaction. The inefficiency of the briefing process has long been recognised as an area which needs improvement To improve on the briefing process, it is necessary to look at the capturing of clients' requirements so as to develop a brief that fully satisfies the clients' needs and requirements. Refurbishment projects are generally characterised to be of higher risk, more complex and needs greater coordination than new build, thus meeting the clients' requirements and working within the constraints of existing building structures may pose a difficult task. Based on an on-going doctorate study, this paper examines the characteristics of refurbishment projects. Clients' requirements and clients' needs are differentiated and client needs for refurbishment projects are explored.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: client requirements; refurbishment; requirements capture
Index terms: refurbishment project, briefing, coordination, construction project, client requirements, client satisfaction, documentation, new build
Subjects: construction integration, management, professional development, infrastructure engineering, production management, client relations, scope management
Topics: Organizational Design, Engineering Principles, Information Management, Project Management, Business Strategy, Stakeholder Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here