Abdel Aziz, A M (2024) Statistical analysis and representation models of calendar-day liquidated damages. Journal of Construction Engineering and Management, 150(6): 04024043, ISSN 0733-9364
Abstract
When projects suffer noncompletion, state highway agencies (SHAs) may trigger liquidated damage (LD) provisions, and at times, contractors may challenge their enforceability. Normally, to be compensated for the costs expected during the delay, states design the LD schedules by associating LD rates to specific contract sizes. A review of the literature found that states varied significantly in the LD schedule designs. However, no studies have explored the relationship between the LD rates and contract sizes (LDR-CS) across states. Exploring this relationship could lead to identifying the underlying model of the relationship, explaining how states vary the LD rates against contract sizes, running comparative analyses of the states' LD schedules, and designing optimal LD schedules, among other potential benefits. To realize these benefits, the objectives of this work were to (1) statistically explore and characterize the LDR-CS relationship, and (2) develop a representative model of the relationship. To achieve these objectives, descriptive, box-whisker, and cluster analyses were performed to characterize the relationship, and regression analysis was utilized to search for the best-fit representation model. The relationship was found to be challenging; it had a unique L-shape, and was modeled successfully only using transformed nonlinear regression. The research results could facilitate performing LD comparative analysis among states, help SHAs assess and build confidence in their LD rates, and help update and optimize LD schedule designs. This work contributes to the body of knowledge with new statistical dimensions to comprehend the LDR-CS relationship, providing tables, charts, and transformed nonlinear models.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | delays; highways; liquidated damages; standard specifications; transportation |
| Index terms: | statistical analysis, regression analysis, dimension, specification, liquidated damages, comparative analysis, cluster analysis, agency, body of knowledge |
| Subjects: | contractual remedy, contractual condition, statistical analysis, sociology, data science, data analysis and analytics, knowledge management, health monitoring assessment and metrics |
| Topics: | Contract Administration, Information Management, Research Practice, Health and Safety |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here