Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(6): 04024046, ISSN 0733-9364
Abstract
Mediation has been promoted as a complementary alternative to traditional adjudicatory resolution methods for settling construction disputes. The use of mediation has been promoted for its time- and cost-saving advantages. The voluntary approach is also considered suitable to the spirit of disputing parties settling their own disputes by themselves and is thus considered a prerequisite design of mediation. Nevertheless, the power asymmetry between disputing parties may hinder bona fide mediation. This study examined the importance of voluntary participation in fostering collaborative mediating behaviors. The impact of power asymmetry on the use of voluntary construction dispute mediation was also explored. With data collected from mediation practitioners and the application of principal component factor analysis, constructs for voluntary participation (VP), collaborative mediating behaviors (CMB), and power asymmetry (PA) were developed. Partial least squares structural equation modeling analyses were then used to test the hypothesized relationships. It was found that (1) the practice of CMB would bring about positive mediation outcomes; (2) VP would engender collaborative mediating behaviors; and (3) PA between the disputing parties would have no significant negative impacts on voluntary attempts at mediation or the practice of CMB. These findings were validated by real mediation cases. This study contributes to construction mediation studies by affirming the importance of keeping mediation a voluntary process. With a flexible process, voluntary mediation can be a tenable option for resolving construction disputes notwithstanding the power differentials between the mediating parties.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | collaborative mediating behavior; power asymmetry; voluntary mediation |
| Index terms: | practitioner, partial least square, mediation, structural equation modelling, factor analysis, resolution, option, construction dispute, dispute |
| Subjects: | conflict resolution, decision analysis, statistical analysis, dispute resolution, practitioner |
| Topics: | Stakeholder Management, Roles and Professions, Risk Management, Research Practice, Legal Issues |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here