Han, J; Chen, C; Tiong, R L K; Wu, K and Chew, D K H (2024) Strategic workforce planning for production of prefabricated bathroom units: An advanced markovian approach. Journal of Construction Engineering and Management, 150(8): 04024097, ISSN 0733-9364
Abstract
Producing prefabricated bathroom units (PBUs) involves a dry installation method that heavily relies on human labor. Therefore, strategically accomplishing efficient and agile workforce planning emphasizes the critical significance. However, previous studies that address workforce planning often overlook the long-term stochastic effects and assume a homogeneous workforce for the sake of computational simplicity. To overcome these limitations, this study adopts the Markovian approach to establish an explicit relationship between workforce cost and cycle time, considering a heterogeneous workforce and uncertain human-caused events. The proposed model has a hierarchical structure that addresses the behavioral tendencies that drive task allocation at the individual level and the aggregate effect of manpower allocation at the operation level. By integrating Little's law in queuing theory and metaheuristics optimization, the cycle time can be calculated while searching for the optimal workforce arrangement configuration. The study cross-validated the computational results with empirical data from a precast factory in Singapore and conducted a sensitivity analysis to verify the reliability. The results show that cross-training workers to multiple skills can lead to significant time savings, with a maximum of roughly 23 h saved in PBU cycle time. Ultimately, this research contributes to the body of knowledge by proposing a strategic workforce planning model that accounts for a heterogeneous workforce and uncertain human-caused events. It utilizes a partial cross-training configuration strategy to maximize productivity and flexibility for PBU production.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Markov chains; offsite construction; prefabricated bathroom unit; strategic planning; workforce planning |
| Index terms: | aggregate, productivity, Markov chain, Singapore, workforce planning, time saving, strategic planning, manpower allocation, strategy, sensitivity analysis, body of knowledge, configuration |
| Subjects: | knowledge management, resource management, mathematical modelling, materials science, systems engineering, time analysis, environmental hazards, management, Geography |
| Topics: | Time Control, Human Resources, Sustainability, Business Strategy, Information Management, Engineering Principles, Research Practice, Geographical Context |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here