Improvement of construction and demolition (C&D) waste management on construction sites

Šelih, J (2005) Improvement of construction and demolition (C&D) waste management on construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Abstract

C&D waste poses a considerable risk for the environment due to its large quantities. Efficient management of this type of waste has to be ensured today in order to reduce its impact. The paper presents sources and classification of C&D waste, and possible waste management alternatives. Ways to increase the effectiveness of the C&D waste management on construction sites are discussed. Legal requirements valid in Slovenia and their influence upon various stakeholders' actions are presented. A case study dealing with demolition of a reinforced concrete bridge and associated C&D waste management is discussed. Based on the findings, it can be concluded that effective C&D waste management contributes to decreased costs and more efficient overall management of the construction site.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: recycling; sustainability; environmental impact; construction planning; material management
Index terms: reinforced concrete, Slovenia, recycling, environmental impact, case study, construction planning, effectiveness, construction and demolition, construction site, waste management
Subjects: environmental impact, building materials, construction planning, Geography, data collection methods, work location, waste management, performance management
Topics: Quality Management, Site Management, Geographical Context, Construction Materials, Sustainability, Research Practice
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here