Abstract

Extensive road projects in large cities produce diverse impacts. This study attempts an assessment of the environmental and socio-economic effects of a recent road upgrade, the mitigating measures of adverse effects experienced and their effectiveness in Ojodu Berger community, a major transport node in Lagos, southwestern Nigeria. Using a survey research design through questionnaire administration, 120 respondents comprising of 50 residents, 40 traders and 30 transport operators were sampled using the purposive sampling technique. The Relative Significance Index (RSI) of project impacts was measured using 27 variables as identified in the literature and general observation of situations in the project environment before the survey. On a 5-point Likert scale at the pre-construction, construction and post-construction phase of the project. The study reveals poor environmental conditions at the pre-construction phase, which became escalated in the construction phase; noise pollution is the most significant impact (RSI = 4.36). At the post-construction phase, encroachment on pedestrian facilities is the most significant impact (RSI = 4.20). Socio-economic impacts such as increased rental value, unemployment and displacement of businesses were also significant. The Mean Index of 3.14 for the construction phase impacts was the highest compared to 3.00 at the pre-construction phase and 3.02 at the post-construction phase. Mitigating measures against adverse impacts were both effective and ineffective, while some adverse impacts were not mitigated. There was no clear evidence that an impact study was done before project implementation. The study recommended strong government commitment to environmental and social impacts assessment of road development, more robust stakeholders' engagement for the formulation of strategies and measures to address the adverse impacts of similar projects in the future.

Item Type: Article
Uncontrolled Keywords: case study; road; environmental protection; socio-economic impact; Nigeria; questionnaire survey
Index terms: Nigeria, pre-construction, research design, case study, road project, social impact, implementation, purposive sampling, construction phase, effectiveness, mitigating measure, Lagos, survey, commitment, strategy, socio-economic impact, environmental protection, noise pollution, environmental conditions, pedestrian, unemployment, evidence, Likert scale, questionnaire
Subjects: psychology, project delivery, economic analysis, environmental science, contractual arrangements, research design and methodology, data collection methods, evaluation and assessment methods, economic and policy analysis, sociology, environmental health, environmental engineering, research methods, performance management, management, financial risk, infrastructure engineering, Geography
Topics: Engineering Principles, Research Practice, Project Management, Geographical Context, Business Strategy, Cost Management, Sustainability, Procurement, Stakeholder Management, Quality Management, Organizational Design
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here