How productive is the construction industry?

Abdel-Wahab, M S; Dainty, A R J and Ison, S G (2006) How productive is the construction industry? In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Abstract

Consistent and reliable construction statistics are crucial for ascertaining the industry's productivity performance. A reliable productivity estimate is essential to establish a reference point for understanding the factors that impinge on productivity performance (e.g. workforce skills). Reviewing the existing construction statistics, alternative productivity estimates were derived based on different statistical sources. This variability presents a distorted and confusing image of the industry's productivity performance and constraints the understanding of any future improvements. Also, it is questionable that the existing data provide an adequate reflection of the nature of the industry. Therefore, there is a need for a thorough understanding of various statistical sources and their underlying assumptions in order to derive a reliable productivity estimate

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: estimates; productivity; reliability; statistics; variability
Index terms: construction statistics, productivity, reflection, variability, statistics, estimate, construction industry
Subjects: financial and cost management, mathematical modelling, industry analysis, statistical analysis, quantitative and statistical methods, professional development, management
Topics: Research Practice, Information Management, Cost Management, Business Strategy
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here