Hansen, S and Siregar, P H R (2020) Analytic hierarchy process-based decision-making framework for formwork system selection by contractors. Journal of Construction in Developing Countries, 25(2), pp. 237-255. ISSN 1823-6499
Abstract
This article presents a study of the contractors’ preference for formwork system selection in Indonesian context. As decision makers, contractors are faced with challenges in choosing the formwork system for a particular project. While conventional timber formwork has been the most used formwork system in Indonesia, aluminium formwork is present although it has not been widely used. Thus, this research investigates the current practices of available formwork systems and its selection criteria in Indonesia. A decision-making framework (DMF) is developed by considering the appropriate assessment criteria for formwork system selection. This framework is then implemented through analytic hierarchy process technique. The result shows that contractors tend to choose aluminium formwork with a preference at 79% compared to conventional timber formwork with a preference at 21%. These findings can be used as considerations for contractors to start using aluminium formwork due to its excellence compared to conventional timber formwork. This study also proves that the proposed DMF can be applied and provides a sound decision related to formwork system selection.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | analytic hierarchy process; contractors; decision-making framework; formwork system selection; Indonesia |
| Index terms: | selection criteria, process-based decision-making, formwork, Indonesia, preference, decision-making |
| Subjects: | decision-making and reasoning, tendering, Geography, building construction, decision analysis |
| Topics: | Risk Management, Construction Technology, Procurement, Research Practice, Geographical Context |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here