Significant decent work objectives for monitoring construction workers' productivity performance in Zimbabwe

Moyo, T; Crafford, G and Emuze, F (2022) Significant decent work objectives for monitoring construction workers' productivity performance in Zimbabwe. Journal of Construction in Developing Countries, 27(1), pp. 95-110. ISSN 1823-6499

Abstract

Decent work deficits in Zimbabwe have exacerbated low construction workers' productivity. Therefore, the functional decent work agenda matrix can potentially be utilised in place of the non-existent construction labour productivity performance monitoring tools. Hence, this study aims to determine significant decent work objectives for monitoring construction workers' productivity performance and also to examine demographic-related statistically significant differences. Given the exploratory nature of the study, a positivist paradigm was utilised for data collection and analysis owing to the aim of revealing relationships between construction workers' productivity performance and decent work objectives (questionnaire survey). Adequate earnings, productive work and environmental context were the most significant objectives while all other objectives were significant towards monitoring construction workers' productivity performance. Demographically targeted interventions include the need for adequate remuneration according to different generations and designations of workers, work-life balance for various designations and educational levels, improving the stability of employment, enhancing social security and improving training and awareness of environmental sustainability for workers of various designations. This study did not consider skilled construction workers' views as this was exploratory. Significant decent work objectives can be utilised to monitor construction workers' productivity performance, thereby improving both workers' welfare and productivity.

Item Type: Article
Uncontrolled Keywords: education; security; sustainability; work-life balance; construction labour; employment; monitoring; productivity; training; construction worker; Zimbabwe; labour productivity; questionnaire survey
Index terms: employment, productivity, construction worker, work-life balance, paradigm, construction labour, monitoring, labour productivity, stability, performance monitoring, survey, environmental sustainability, Zimbabwe, questionnaire
Subjects: data collection methods, control systems, practitioner, structural engineering, management, education and knowledge transfer, monitoring and control systems, health safety and environment, Geography
Topics: Roles and Professions, Governance, Business Strategy, Health and Safety, Research Practice, Geographical Context, Engineering Principles, Site Management, Human Resources
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here