Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Abstract
The traditional construction procurement approach engenders adversarial attitudes and the pursuit of individual organisation’s gain has led to inefficiencies and poor project management. Previous studies suggest collaborative working in the construction supply chain may produce better outcomes. This article examines the drivers and barriers to embracing collaborative procurement practices pertinent to the construction industry in the developing world; using Malaysia as a base of the study. Drawing on an empirical survey involving construction professionals (contractors, consultants and clients), the significance of the drivers and barriers are prioritised based on mean scores. The most significant drivers are better quality outcome, better cost control, better time control, effective problem solving and increased client satisfaction. As for the barriers, resistance to change current way of working, communication problem, incompatible personalities and organisational cultures, lack of top management support, and inadequate training and guidance rank the highest. Next, Kruskal- Wallis tests were selected to compare the results given by the three groups of respondents. All the drivers are homogeneously perceived except for “long-term relationship”. Homogeneous perceptions are observed for all drivers. Results from this study are expected to benefit both construction practitioners and researchers in the exploration, planning and implementation of collaboration-based project procurement arrangements.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction supply chain; client satisfaction; communication; construction procurement; cost control; problem solving; time control; training; Malaysia; culture; organisational culture; client; consultant; professional |
| Index terms: | problem solving, top management, exploration, cost control, collaboration, organizational culture, project procurement, time control, survey, construction practitioner, drawing, collaborative project, construction procurement, construction supply chain, client satisfaction, construction professional, project management, construction industry, implementation, traditional construction, Malaysia, personality |
| Subjects: | project controls, sociology, industry analysis, heritage and conservation, behavioral psychology, management, decision-making and reasoning, Geography, project management theory and practice, professional development, technical documentation, environmental resource management, contractual arrangements, financial and cost management, data collection methods, client relations, construction logistics |
| Topics: | Design Practice, Supply Chain Management, Organizational Design, Time Control, Cost Management, Geographical Context, Project Management, Research Practice, Information Management, Stakeholder Management, Procurement, Sustainability |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here