Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(1), pp. 60-79. ISSN 1366-4387
Abstract
Purpose The purpose of this study is to investigate the relationship between tender figures, consultants' figures and final construction costs of construction projects under competitive bidding in the Nigerian construction industry, as guided by the due process policy, a national public procurement reform program. Design/methodology/approach A total of 13 construction professionals and public contract administrators were interviewed. Their views were reported intermittently as the secondary data collected on 137 projects; 95 of these were construction and 42 supply projects. The findings are then analyzed and discussed. Findings The study presents a number of regression models which can be used to predict the final cost and actual duration of construction and supply projects under the due process regime in Nigeria as functions of lowest bids, consultant estimates, successful bid, gross floor area, average bid, contractor's proposed contract duration and the consultant's proposed contract duration. Practical implications The models used, apart from being worthy benchmarks for future study, can be of immense use to developing countries with the intention of implementing the due process policy of Nigeria in their countries as the limitations of the reform are succinctly discussed. Moreover, with the growing prospect for heavy engineering projects, the study will be of use to intending international contractors willing to explore the Nigerian construction market, either by holistic participation or by forming partnerships or alliances with Nigerian domestic firms. Originality/value The paper presents one of the pioneering stochastic studies based on empirical data on construction and supply projects under the due process reform in Nigeria.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | asset valuation; Nigeria; project management; tendering |
| Index terms: | construction project, program, methodology, comparative analysis, developing country, contract administrator, competitive bidding, estimate, duration, construction industry, future study, project management, construction market, public construction, construction professional, construction cost, partnership, secondary data, Nigeria, gross floor area, regression model |
| Subjects: | data analysis and analytics, bidding, financial and cost management, data collection methods, research design and methodology, practitioner, project controls, market analysis, partnership management, building construction, building performance, industry analysis, statistical analysis, software systems, research methods, Geography, production management, project management theory and practice, development economics, professional development |
| Topics: | Time Control, International Construction, Digital Applications, Design Practice, Procurement, Stakeholder Management, Roles and Professions, Information Management, Engineering Principles, Geographical Context, Project Management, Research Practice, Cost Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here