Head contractor role in construction value-based management: Australian building industry experience

Perera, S; Davis, S and Marosszeky, M (2011) Head contractor role in construction value-based management: Australian building industry experience. Journal of Financial Management of Property and Construction, 16(1), pp. 31-41. ISSN 1366-4387

Abstract

Purpose – Value in construction is defined in so many ways and used to mean many different things, often linked to cost, time, objectives and customers that there exists no concise and complete description of what constitutes value within a construction context. Hence, the purpose of this paper is to study the current perceptions of value by the construction players and compare with emerging theories of value in the literature. Design/methodology/approach – Empirical evidence of prevailing perceptions of value within the support role provided by the head contractor (HC) to the subcontractors (SCs) is presented based on two years of action research on six construction sites in Sydney, Australia. Findings – The results show that value management during the construction phase is currently understood as intrinsic to other HC functions. The paper presents a list of activities identified by HCs and SCs as key support services to be performed by the HC to enable efficient progression of construction. Research limitations/implications – There are limitations in generalising the outcomes of this study to the construction industry. Further research is required in advancing the role of the HC in overall construction organisation. Originality/value – This paper adds value in advancing the role of the HC in construction. Empirical evidence of value-based management closely following the current perceptions of the construction players compared to managing value as a separate function is presented..

Item Type: Article
Uncontrolled Keywords: Australia; productivity rate
Index terms: action research, construction site, evidence, methodology, subcontractor, construction organization, Australia, productivity, value management, building industry, construction industry, construction phase
Subjects: work location, project delivery, organization, data collection methods, evaluation and assessment methods, practitioner, industry analysis, research methods, management, Geography
Topics: Business Strategy, Research Practice, Geographical Context, Project Management, Roles and Professions, Value Management, Site Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here