Belniak, S; Leśniak, A; Plebankiewicz, E and Zima, K (2013) The influence of the building shape on the costs of its construction. Journal of Financial Management of Property and Construction, 18(1), pp. 90-102. ISSN 1366-4387
Abstract
The choice of a particular architectural solution when designing a building considerably influences the costs of its construction. The aim of this paper is to present the indexes which may relate to the complexity of the building shape, and which were then specified and compared on a particular example. The article analyses various indices of building shape evaluation, their influence on the changes in construction costs and their sensitivity to the changes in the dimensions of the building. The methodology adopted in this article concerns the analysis of the selected simple factors assessing the shape of the building against the cost-effectiveness of constructing the basic elements of the building. The authors established the best building shape in relation to the costs of constructing the walls and foundations (square), and to the layout of the inside of the building (rectangle). They believe that the best evaluations of building shape were achieved by the LBI index, which evaluated the shape correctly in all of the analysed examples and which is the most sensitive to the changes in building parameters in correct proportions to the changes in construction costs. The article presents the indexes which may relate to the complexity of the building shape. The authors established the best building shape in relation to the costs of constructing. The authors provide the degree of the floor area usability in buildings of various shapes.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | building shape; building surface; buildings; cost of building; cost-effectiveness |
| Index terms: | construction cost, dimension, foundations, usability, cost-effectivenes, complexity, methodology |
| Subjects: | economics, research methods, structural engineering, systems engineering, user-centered design, health monitoring assessment and metrics, financial and cost management |
| Topics: | Health and Safety, Cost Management, Engineering Principles, Research Practice, Design Practice |
| Descriptive scope: | 2 CT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here