Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft

Fadiya, O O; Georgakis, P; Chinyio, E and Akadiri, P (2013) Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft. Journal of Financial Management of Property and Construction, 18(2), pp. 128-141. ISSN 1366-4387

Abstract

The purpose of this paper is to consider the significance of the sources of cost of construction plant theft identified in previous studies and derive rates which can enhance proper estimation of the cost of plant theft to the construction industry. The direct and indirect costs of plant theft include replacement cost (new-for-old/depreciated), emergency cost, hire replacement cost, productivity loss, increased labour cost, loss of goodwill, administration cost, increased insurance premium and social cost. The cost-contribution of these various sources was studied, using a structured questionnaire which was administered to building contractors in the UK construction industry, to measure their opinions of the frequency and severity of the contribution of the sources to the cost of construction plant theft. The questionnaires were administered to 220 companies and 51 of them were fully completed, representing 23.1 per cent of the original sample. The responses were analysed using descriptive and inferential statistics to derive the probabilities of sources contributing to the cost of plant theft. The results of the analysis show that the rates of contribution to the cost of plant theft varies significantly between the sources, with “loss of output” and “increased insurance premium” ranking as the top-two costs of plant theft in the UK construction industry. The rates derived in this study can be used by contractors to reasonably estimate the cost of plant theft, especially when there is need to justify the adoption of measures that can mitigate plant theft. This study generated rates of contribution by factors which contribute to the overall cost of theft of construction plant in the UK. These rates can provide a more reliable estimate of the cost of plant theft than current estimations which vary significantly.

Item Type: Article
Uncontrolled Keywords: construction equipment; construction plant theft; costs; estimation; probabilities; rates; theft; United Kingdom
Index terms: theft, United Kingdom, questionnaire, replacement, building contractor, construction equipment, construction plant, indirect cost, estimation, productivity, labour cost, insurance, statistics, construction industry, estimate
Subjects: management, construction equipment, Geography, cost management, industry analysis, mathematical modelling, data collection methods, criminal law, practitioner, materials science, financial and cost management, economic analysis
Topics: Legal Issues, Business Strategy, Cost Management, Geographical Context, Research Practice, Engineering Principles, Roles and Professions, Procurement, Plant and Equipment
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here