Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387
Abstract
Purpose – This paper aims to develop a multivariate model that will be applicable to the Nigeria construction industry. Design/methodology/approach – A self-administered questionnaire survey was used to source information on project scope factors and qualitative factors considered in the study. Principal component regression was used for data analysis and model development, using SPSS 16.0 for windows, while T-test was used for model testing and validation. Findings – The study found that delay in progress payment by owner, lateness in revising and approving design document by owner, delay in delivering the site to the contractor by the owner, change order by owner during construction, complexity of project design, poor site management and supervision by contractors, and rain effect on construction activities are qualitative/non-project scope factors with good predictive abilities. Research limitations/implications – Cost, gross floor area and number of floors were the only quantitative/project scope factors considered in the study. The developed models therefore do not account for any variation in duration which may arise from other project scope factors, such as location, procurement route and type of contract. Originality/value – The qualitative factors which emerged as predictors in the derived models increased the accuracy of the models. The models developed therefore serve as useful construction time prediction tools for both consultancy firms and contractor organizations in the Nigerian construction industry.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | prediction; construction time; multivariate model; principal component regression; project scope; qualitative factors |
| Index terms: | model development, complexity, multivariate model, consultancy, variation, methodology, window, questionnaire, validation, building construction, survey, accuracy, model testing, data analysis, modelling, construction industry, duration, qualitative factor, construction time, supervision, rain, site management, project scope, principal component regression, owner, construction activity, gross floor area, Nigeria, change order, project design, contractor organization |
| Subjects: | analytical methods, data analysis and analytics, contractual arrangements, construction operations, scope management, control systems, reliability engineering, climate science, organization, data collection methods, statistical analysis, systems engineering, industry analysis, sociology, building performance, building construction, project controls, professional development, contractual condition, Geography, research methods, architectural elements |
| Topics: | Research Practice, Geographical Context, Project Management, Information Management, Engineering Principles, Stakeholder Management, Construction Technology, Procurement, Sustainability, Design Practice, Time Control, Contract Administration, Organizational Design, Site Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here