Physical factors affecting productivity of Turkish construction workers

Kazaz, A and Ulubeyli, S (2006) Physical factors affecting productivity of Turkish construction workers. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Abstract

This survey investigates the current situation of labour productivity in the Turkish construction industry from physical viewpoint. In this research, it is aimed that the physical factors influencing worker performance are determined, defined, and evaluated in detail. For this purpose, a survey of 82 large scale construction companies in Turkey was carried out. The survey used a questionnaire applied to managers, engineers, and architects of the firms with one-to-one technique. The results were evaluated by means of the relative importance index method. The research findings pointed out that working at similar activities, design complexity, and error tolerance were ranked as the three most influential physical factors on worker performance.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: labour; physical factors; productivity; Turkey
Index terms: construction industry, construction worker, complexity, physical factor, architect, labour productivity, questionnaire, productivity, engineer, relative importance index, survey, construction company, manager, Turkey
Subjects: environmental science, data collection methods, risk assessment, profession, organization, practitioner, industry analysis, systems engineering, management, Geography
Topics: Engineering Principles, Research Practice, Geographical Context, Business Strategy, Sustainability, Risk Management, Roles and Professions, Site Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here