Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099
Abstract
The purpose of this research project is to reduce the carbon emissions of construction processes by Measuring, Mapping, Modelling and Managing (4Ms) the carbon performance of construction activities. This particular paper presents the research work and major findings in the first two stages: measuring the carbon footprint of construction activities in building projects; and mapping the carbon emissions from construction activities. A hotel project in South Wales was selected as a case study where the carbon emissions from six categories of construction activities (i.e. management, operations, visitors, deliveries, plant and utilities) were monitored by using carefully designed data collection methods throughout the construction process. Both qualitative and quantitative analysis methods were adopted to distil and map the emissions with construction activities. This study provides a benchmark for the carbon emissions from construction processes. The results show that construction activities generate more carbon than expected. Of the CO2 emitted, materials delivery, operational activities and plant operation account for more than 90 per cent of the total emissions. Activities from management, visitors and utilities only contributed 10 per cent of the CO2 emissions. Carbon emissions from construction processes can be best managed through project planning/scheduling where carbon emissions should be considered as a new criterion for project planning along with time, cost and quality. There are some limitations with the data collection methods adopted in this study. For example, the fuel/CO2 emission conversion rate for plant was obtained from online sources. This rate needs to be validated and adjusted on-site with CO2 measurement gauges for different equipment. Similarly, the fuel efficiency adjusting rates for vehicles also need to be checked and verified constantly. The on-site carbon emission methods, the mapping approaches between the emission and construction activities, and the online system developed in this study (www.constructco2.com/default.aspx) are all embraced by the industry. So far, 76 projects have already subscripted to the online system. This study developed a set of systematic and feasible approaches to measuring and analysing carbon emissions from construction activities. Unlike the existing studies which mainly focus on recording the carbon emissions on-site, this research measured the emissions, and mapped the emissions with construction activities. The online system developed could analyse the data collected and support the contractor to decide in which aspects they should make effort to control the carbon emissions.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | carbon; construction activities; construction works; emission; mapping; measurement; United Kingdom |
| Index terms: | construction process, Wales, construction project, construction activity, utilities, carbon emission, carbon footprint, scheduling, CO2 emissions, construction work, efficiency, project planning, hotel, quantitative analysis, modelling, case study, default, conversion, mapping, United Kingdom |
| Subjects: | dispute resolution, data collection methods, manufacturing engineering, data analysis and analytics, Geography, construction operations, construction type, building construction, operations management, production management, spatial and geospatial analysis, environmental impact, air quality, analytical methods, performance management, control systems, operations research, climate science |
| Topics: | Construction Technology, Project Management, Legal Issues, Site Management, Quality Management, Geographical Context, Time Control, Research Practice, Sustainability, Engineering Principles |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here