Environmental life cycle analysis of a fixed PV energy system and a two-axis sun tracking PV energy system in a low-energy house in Turkey

Aksoy Tırmıkçı, C and Yavuz, C (2019) Environmental life cycle analysis of a fixed PV energy system and a two-axis sun tracking PV energy system in a low-energy house in Turkey. Smart and Sustainable Built Environment, 8(5), pp. 391-399. ISSN 2046-6099

Abstract

Purpose: The purpose of this paper is to propose a fixed PV energy system design and a sun tracking PV energy system design to meet the primitive energy demands of a typical house in Sakarya, Turkey with energy payback times (EPBT) and greenhouse payback times (GPBT) calculations. Design/methodology/approach: The designs were developed based on the total solar radiation received on the surface of the PV modules. The EPBT and the GPBT of the designs were investigated by utilizing the current embodied energy data of the literature and annual energy output of the proposed systems. The monthly mean total solar radiation, the yearly total solar radiation and the annual energy output of the systems were calculated according to the results of previous studies of authors on 80-W prototypes of a fixed PV energy system tilted at the yearly optimum tilt angle of Sakarya and a two-axis sun tracking PV energy system. Findings: The annual energy outputs of the fixed system and the tracking system were established to be 10.092 and 10.311 MJ, respectively. EPBT of the systems were estimated 15.347 years for the fixed system and 11.932 years for the tracking systems which were less than the lifespan of PV modules. The greenhouse gas emitted to produce and install the systems were estimated to be 6,899.342 kg for the fixed system and 5,040.097 kg for the tracking system. GPBT of the systems were calculated to be 5.203 and 2.658 years, respectively. Originality/value: PV energy is clean without greenhouse gas emission during the operation. However, significant emissions occur in the life cycle of PV modules until the installation is completed. Therefore reducing the number of PV modules make great differences in the GPBT of PV energy systems. In this paper, comparisons between the GPBT results of the optimally tilted fixed system and tracking system were performed to discuss the best option by means of environmental concerns.

Item Type: Article
Uncontrolled Keywords: energy payback time; greenhouse payback time; optimum tilt angle; photovoltaic energy system; sun tracking; total solar radiation
Index terms: environmental concern, solar radiation, life cycle, sun, Turkey, energy demand, embodied energy, option, energy system, tilt angle, photovoltaic, module, life cycle analysis, prototype, low-energy house, lifespan, greenhouse gas, greenhouse gas emission, methodology, payback
Subjects: environmental health, decision analysis, Geography, research methods, geometry and topology, architectural elements, economic analysis, material degradation and durability, energy systems, modelling and simulation, value management, climate science, environmental issues, environmental impact, construction type
Topics: Business Strategy, Engineering Principles, Construction Materials, Research Practice, Geographical Context, Project Management, Risk Management, Sustainability, Construction Technology, Design Practice
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here