Construction planning through 4D BIM-based virtual reality for light steel framing building projects

Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099

Abstract

Purpose: The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how construction practitioners perceive technology integration in construction planning in light of emerging technologies. This study intended to uncover unique experimental findings by integrating 4D-building information modelling (BIM) to virtual reality (VR) technology during construction planning among construction professionals at light steel framing (LSF) projects. Design/methodology/approach: The building industry participants were invited to provide inputs on two different construction planning methods: conventional and innovative methods. The conventional method involved the participants using traditional platforms such as 2D computer-aided design (CAD) and physical visualisation of paper-based construction drawings for the LSF assembly process with a Gantt Chart tool to complete construction planning-related tasks for the targeted project. Comparatively, participants are required to perform the same tasks using more innovative platforms like 4D-BIM in a VR environment. Findings: A Charrette Test Method was used to validate the findings, highlighting an improvement in usability (+10.3%), accuracy (+89.1%) and speed (+30%) using 4D BIM with VR compared to the conventional paper-based method. The findings are also validated by a paired t-test, which is supported by the rationality of the same findings. This study posits positive results for construction planning through the utilisation of modern practices and technologies. These findings are significant for the global construction industry facing low productivity issues, delays and certainty in terms of building delivery timelines due to poor construction planning. Originality/value: This new blend of technologies—combining 4D BIM and VR in industrialised construction projects—potentially directs future initiatives to drive the efficiency of construction planning in the building lifecycle. The interactive BIM-based virtual environment would purposefully transform construction planning practices in order to deliver modern and more certain building construction methods with a focus on prefabrication processes.

Item Type: Article
Uncontrolled Keywords: building information modelling; construction education; construction planning; digital construction; industrialised construction; light steel framing; virtual reality
Index terms: charrette, computer aided design, integration, construction education, methodology, industrialized construction, visualization, virtual environment, rationality, framing, accuracy, construction practitioner, drawing, usability, building construction, lifecycle, virtual reality, construction professional, emerging technology, building industry, global construction, construction planning, construction industry, prefabrication, digital construction, platform, efficiency, building information modelling, productivity
Subjects: conceptual models, innovation and technology management, construction planning, project delivery, technical documentation, construction type, strategic management, computational design, user-centered design, virtual reality, industry analysis, information systems, organizational analysis, building construction, professional education, digital design, design process, professional development, management, design practice, performance management, decision-making and reasoning, research methods
Topics: Construction Technology, Business Strategy, Research Practice, Project Management, Information Management, Education, Site Management, Organizational Design, Design Practice, Digital Applications, Quality Management, International Construction
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here