Abstract

The competitive bidding literature was reviewed and the competitive building problem in the building construction industry was examined. The following elements must be considered in order to determine optimal bid: (1) the probability distribution of the cost of performing the work, (2) the contractor's utility function, and (3) the assessment of the probability of winning with different bid amounts. Three ways of determining the probability function of the total cost were mentioned and several of the factors that influence this probability distribution were discussed. The three methods of estimating the probability distribution of the total cost which were considered were: (1) the convolution of normally distributed elemental costs, (2) the convolution of subjectively determined beta distributed elemental costs, & (3) estimation of the distribution of the accuracy of the construction cost estimate as determined by the ratio of the true cost to the estimated cost on the basis of historical information. Factors that contribute to the uncertainty of the construction cost estimate discussed are: subcontractor bids, material costs, labor costs, location of the job, type of construction, and supervisory talent. The axioms of utility theory were introduced. The equations of the bilinear and exponential utility functions used in the development of the proposed bidding models were developed. Variables that affect the distribution of the bid were used in a regression type model to assess the probability of winning with different bids. The competitive bidding problem was cast as a two stage lottery and a number of equations were developed expressing the expected utility conditional on winning as a function of the bid amount and the parameters of the distribution of cost. Different probability distributions were used in combination with the bilinear and exponential utility functions, and representative curves were shown for the cases of these utility functions across the uniform profit lottery.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: bidding; competitive bidding; cost allocation; estimates; mathematical models; probability theory; regression analysis
Index terms: estimation, probability distribution, construction cost, regression analysis, estimate, labour cost, profit, accuracy, utility theory, building construction, mathematical model, competitive bidding, convolution, bidding, subcontractor, estimating
Subjects: data science, bidding, financial and cost management, economic analysis, practitioner, mathematical modelling, cost management, economic theory, statistical analysis, building construction, professional development
Topics: Digital Applications, Roles and Professions, Procurement, Construction Technology, Cost Management, Business Strategy, Information Management, Research Practice
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here