Narayana, N S S (1976) Engineering production function and choice of technique. PhD thesis, Indian Statistical Institute - Kolkata, India.
Abstract
This study deals with the selection of technological alternatives of production, a problem referred to as "choice of techniques" in economic theory. Selection of an appropriate technique (or a technological alternative) has to be made with respect to specified objectives and available resources. Selection of proper techniques from among many available alternatives has been one of the main tasks while planning for economic development. Generally, developing countries like India are handicapped by problems of scarcity of non-labour resources, abundant labour force, limited foreign aid, limited technical know-how etc. to mention but a few of them. Hence, detailed exercises on choice of techniques, separately for each sector of a given economy, taking all the related constraints and objectives into account, are of great significance for proper planning. The subject matter of this project work is one such exercise. The technical alternatives are identified through engineering analysis and the choice of techniques is made in the context of the objectives of economic planning. In particular, the implications of the distribution are investigated. This study is confined to the construction sector of the Indian economy. Construction includes buildings, road and bridges, dams, irrigation works, industrial plants etc. This study, however, covers only buildings and road construction. The two exercises (for buildings and roads) proceeded in the following way: First, the output is fixed as explained later in this chapter. Next, all the possible technical alternatives of producing this output are identified. Then, all the technical and economic constraints, it any, are formulated. Optimal levels of the technical alternatives with respect to the specified objective (cost minimisation or employment maximisation) are then obtained by means of a linear programming model. Various approaches have been adopted previously in dealing with the problems of choice of techniques. Generally, statistical data, cross-section or time series collected at the firm or plant level have been used in these approaches to identify various available alternative techniques. The results based on such ex-post data may not reveal the full potential flexibility and scope for choice of techniques. Analysis based on these data gets confined only to the range of statistical observations which may be quite narrow. In addition, these approaches generally identify only two factors, capital and labour, and treat them as homogeneous goods. Two points are to be noted here: (a) Only capital and labour are considered as variables and current inputs are not; this may be alright if the output is narrowly defined in which case, not much change in the levels of current inputs is expected between techniques. However, if output is defined by the functional needs that they satisfy, the changes in current inputs may become significant and should be considered while selecting techniques. (b) Capital and labour are in fact heterogenous. When capital is taken to be homogeneous it is assumed to be shiftable between techniques, which may not be important in choice of technique in a static framework. However, the assumption of homogeneity of labour and capital ignores the different skills of labour and types of capital required for different techniques and the various constraints on the availability of such skills and machines in the economic. Besides, it is necessary to identify labour of different income classes separately for a simultaneous analysis of choice of techniques in the context of income distribution in society.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Thesis advisor: | Parikh, K S |
| Uncontrolled Keywords: | construction sector; economic development; flexibility; skills; economic theory; developing countries; employment; irrigation; programming; road construction; India; linear programming; time series |
| Index terms: | programming, construction sector, labour force, minimization, society, foreign aid, economic development, developing country, time series, maximization, road construction, income, labour resource, India, exercise, economic theory, linear programming, employment |
| Subjects: | data science, economic analysis, programming, health behaviours and lifestyles, communities and social development, industry analysis, business economics, economic concepts, Geography, development economics, economic development, management, algorithms, civil engineering, economics |
| Topics: | Research Practice, Geographical Context, Engineering Principles, Business Strategy, Health and Safety, Sustainability, Stakeholder Management, Human Resources, Supply Chain Management, International Construction, Digital Applications |
| Descriptive scope: | 4 PCTA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here