Heavy construction equipment replacement economics

Schexnayder, C J J (1980) Heavy construction equipment replacement economics. PhD thesis, Purdue University, USA.

Abstract

Optimal machine replacement is critical to the survival of contractors operating in the equipment intensive fields of construction. This study presents a replacement analysis method which, while simple enough to permit application by a medium-size construction contractor having a limited cost data system, is still based on sound economic theory. In support of the development of the analysis procedure the nature of a construction company's operating environment is examined. Based on that examination a cost minimization technique was identified to be the most appropriate analysis method. Because the analysis process incorporates present value procedures it was necessary to establish the correct interest rate factor. This question was explored and it was determined that the proper interest rate is the cost-of-capital rate for the particular firm making the analysis. A method for calculation of this cost-of-capital rate was, therefore, included in the study. The analysis procedure presented is intended for practical application by those charged with equipment management responsibility. It is presented in the form of a set of replacement-decision cost factors and their respective mathematical formulas. The only requirements for application are normal corporate accounting data and equipment utilization and expense records. However, better record keeping will provide data for more accurate predictions. The structure of the analysis is that of investigating each replacement factor as an isolated cost. This format facilities sensitivity checks of different assumptions or policies. The analysis yields an optimum replacement timing cycle and a corresponding equivalent annual cost. To check the analysis' application, input data was obtained from three construction companies and typical analyses performed. The analysis method proved compatible with the current record keeping practices of all the firms queried.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: economic theory; construction equipment; equipment; interest rate; replacement; construction contractor
Index terms: minimization, construction company, equipment management, interest rate, replacement, construction contractor, accounting, construction equipment, cost factor, economic theory, survival, cost data, heavy construction
Subjects: materials science, practitioner, organization, environmental science, economic analysis, operational management, construction equipment, economics, accounting and finance, algorithms, infrastructure and transport systems
Topics: Engineering Principles, Cost Management, Business Strategy, Sustainability, Plant and Equipment, Roles and Professions, Digital Applications
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here