A simplified methodology for evaluating rural road proposals for less developed countries

Severn, B W (1980) A simplified methodology for evaluating rural road proposals for less developed countries. PhD thesis, University of New Mexico, USA.

Abstract

The purpose of the study is to develop a simplified method for analyzing and evaluating rural road project proposals in LDCs that can be utilized by host government agencies charged with rural road development. The study begins by examining the traditional or ideal producer surplus approach utilized by most transport economists for estimating the impact of rural road improvement. The examination reveals that the two variables, local consumption and transporter revenue, can be eliminated from the traditional method without significantly affecting the rate of return analysis. Further examination reveals that the detailed level of yearly changes in total farm revenue and total farm cost due to the road improvement is not justified by the level of knowledge of the interaction between road improvement and output. Based on the above findings, the study suggests that analysts should determine the maximum change to be expected as a result of road improvement, the year in which it is expected to occur (three to five years is the suggested time period), and then to estimate the changes from the first year after road improvement to the maximum change year (unless there is information providing more precise knowledge of yearly change, linear change is suggested). With this maximum change figure, the year in which it occurs, and the yearly changes until the maximum is reached, the study demonstrates how to adjust the sum of discount figures so that the present value of the change in total farm revenue (dTR) and total farm cost (dTC) for the entire project period can be expressed in terms of the total change times an adjusted sum of discount factors figure (ASDF). Applying this same technique to the yearly maintenance costs completes the adjustments necessary for developing a simplified Benefit/Cost (B/C) equation that can be handled quite easily by non-economic/financial personnel. In the numerator, the simplified B/C equation consists of the number of farms (Farms) within the area of influence of a road segment times the estimated total change in farm revenue (dTR) times its ASDF, plus the discounted road salvage value. In the denominator is included the discounted value of road construction costs, plus the yearly maintenance cost variable (Maint) times its ASDF, and finally the term (Farms) (dTC) (ASDF) to obtain the present value of the change in total farm costs. The ASDF value for dTR and dTC may or may not be equivalent. With the rate of return analysis reduced to a simplified B/C equation, the study illustrates how much easier it is for a host agency to apply this simplified approach than the more traditional ideal one. Having eliminated the local consumption and transporter variable in the original development of the simplified B/C method, the study then demonstrates how they can be included in the equation without destroying its simplicity, if the analyst believes the data is reliable and necessary for the analysis. The study also indicates that in the special case where there is a high degree of homogeneity between areas to receive improved roads of same length and cost, the B/C ratio can be used to rank order road segments, and that the critical variable is the number of farms (Farms), served by each road segment.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: personnel; construction cost; estimating; government; road construction
Index terms: salvage, construction cost, road construction, estimate, interaction, road project, discount factor, maintenance cost, personnel, proposal, government agency, revenue, methodology, developed country, agency, consumption, estimating
Subjects: sociology, administrative law, behavioral psychology, financial management, management, civil engineering, research methods, infrastructure engineering, development economics, project planning, economic analysis, financial and cost management, consumer economics, waste management
Topics: Business Strategy, Cost Management, Research Practice, Project Management, Engineering Principles, Stakeholder Management, Sustainability, Legal Issues, Human Resources, International Construction
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here