Evaluation and development of drainage and pipeline construction processes

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Abstract

In 1974 Dr D M Bramwell published his research work at the University of Aston a part of which was the establishment of an elemental work study data base covering drainage construction. The Transport and Road Research Laboratory decided to, extend that work as part of their continuing research programme into the design and construction of buried pipelines by placing a research contract with Bryant Construction. This research may be considered under two broad categories. In the first, site studies were undertaken to validate and extend the data base. The studies showed good agreement with the existing data with the exception of the excavation trench shoring and pipelaying data which was amended to incorporate new construction plant and methods. An inter-active on-line computer system for drainage estimating was developed. This system stores the elemental data, synthesizes the standard time of each drainage operation and is used to determine the required resources and construction method of the total drainage activity. The remainder of the research was into the general topic of construction efficiency. An on-line command driven computer system was produced. This system uses a stochastic simulation technique, based on distributions of site efficiency measurements to evaluate the effects of varying performance levels. The analysis of this performance data quantities the variability inherent in construction and demonstrates how some of this variability can be reconciled by considering the characteristics of a contract. A long term trend of decreasing efficiency with contract duration was also identified. The results obtained from the simulation suite were compared to site records collected from current contracts. This showed that this approach will give comparable answers, but these are greatly affected by the site performance parameters.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: duration; measurement; drainage; pipeline; construction method; estimating; excavation; work study; simulation
Index terms: excavation, estimating, drainage, pipeline construction, laboratory, computer system, programme, construction method, design and construction, placing, variability, duration, work study, construction plant, pipeline, efficiency
Subjects: computing systems, financial and cost management, construction operations, contractual arrangements, construction equipment, performance management, civil engineering, management, concrete and cementitious materials, statistical analysis, infrastructure and transport systems, building construction, research management, project controls
Topics: Time Control, Site Management, Digital Applications, Quality Management, Plant and Equipment, Procurement, Business Strategy, Cost Management, Engineering Principles, Construction Materials, Research Practice
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here