Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.
Abstract
After more than two decades of applying CPM as a planning and scheduling technique, recommended by a large number of researchers and backed by wide publicity, there is a growing doubt about CPM's ability to achieve some of the advantages attributed to its application at the beginning. There is a growing awareness of the CPM application problems. These problems are causing its application to be discarded in some small and large companies and limiting its use to the cases where required by clients. Some of the planners and schedulers, whom the researcher met through the survey interviews, had become totally unconvinced by any of the available planning and scheduling techniques. They discarded CPM or limited its application to a few projects when they had to and began to depend on their own experience. They used bar charts only as a method of presenting the developed schedules. The researcher has developed a new planning and scheduling model in which he tried to satisfy some requirements outlined in chapters two and four. The developed model offers different degrees of depth and scope, which satisfy all the different needs in the different project stages. The model uses the heuristic scheduling approach and classifies scheduling cases using two new criteria; the tightness degrees of completion due-dates and resource tightness degrees. The model and the associated heuristic scheduling rules proved throughout the scheduling experiments, to be practical, applicable, flexible and efficient. The researcher found no evidence for the need to introduce major modifications in the logical structure of the developed model to make it applicable and acceptable for construction companies in Egypt and other developing countries. With more training for responsible planners and schedulers and close follow up of the model implementation, especially in the early stages, the model could be efficient and applicable for these companies.
| Item Type: | Thesis (Doctoral) |
|---|---|
| Uncontrolled Keywords: | developing countries; scheduling; interview; experiment; heuristic; Egypt |
| Index terms: | planner, construction company, experiment, Egypt, evidence, scheduling, developing country, heuristic, interview, construction project, implementation, survey, scheduler |
| Subjects: | organization, data collection methods, Geography, development economics, practitioner, evaluation and assessment methods, risk assessment, operations research, profession, contractual arrangements, production management |
| Topics: | Geographical Context, Time Control, Project Management, Business Strategy, Roles and Professions, Procurement, Research Practice, International Construction, Risk Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here