Site layout and construction planning

Morgan, D C (1986) Site layout and construction planning. PhD thesis, University of Nottingham, UK.

Abstract

The current usage of site layout information in construction planning techniques is investigated, and the layout development methods used in other fields such as Architecture and Production engineering are also reviewed. The limitations, applicability and potential of these models is discussed. The layout of a construction site affects the manner in which construction plans are formed. This research is an attempt to isolate the site layout factors which are taken into account in the planning stages of a project. The layout of a construction site may be utilised in the formation of construction plans in two ways. Firstly, the large scale layout of the structures may influence the order in which the structures are built. Secondly, the small scale layout of the work within each individual structure will determine the order in which that work will be carried out. A model has been developed which uses the two types of site layout information for the structure and activity sequencing in the production of construction plans on a micro-computer. The practicality and performance of this model has been tested by comparison of the plans produced with those produced with other planning methods and those produced in industry. The feasibility of the integration of this model with Computer-aided design packages has been discussed with a view to producing construction plans automatically from the contract drawings.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: computer-aided design; construction planning; construction site; integration; site layout
Index terms: construction planning, integration, site layout, package, computer aided design, construction site, small scale, drawing, planning method
Subjects: site logistics, urban planning, computational design, construction planning, work location, production management, organizational analysis, technical documentation, contractual arrangements
Topics: Design Practice, Digital Applications, Organizational Design, Project Management, Site Management, Procurement, Governance
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here