A conceptual construction project planning model (fuzzy sets, networks)

Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.

Abstract

Construction projects have been the subject of many previous evaluations. Monitoring projects with schedules, forecasting possible completion times and evaluating project delays have all been reviewed in detail by other researchers. None are developed that account for the contractor's intuitive estimates of factors outside of the quantities and times. The potential for schedule planning improvement to reduce project delays is investigated. The main focus of this study is on the process of planning a construction schedule that isolates factors outside the "normal" schedule and incorporates their influence through various models. The primary advantages to the proposed system is that the resulting schedule incorporates a simulated weather pattern, adjusts planned schedule durations for the sensitivity of the activity and adjusts for system factors outside of the schedule activities.

Item Type: Thesis (Doctoral)
Uncontrolled Keywords: duration; construction project; forecasting; monitoring; weather
Index terms: project delay, completion time, schedule planning, fuzzy set, monitoring, weather, forecasting, estimate, construction project, duration
Subjects: financial and cost management, project controls, production management, air quality, operations research, control systems, prediction and forecasting, decision-making and optimization
Topics: Project Management, Sustainability, Cost Management, Site Management, Research Practice, Time Control
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here